User

Ashrakat Rady

Member since
Total activity 418
Last activity
Following 0 users
Followed by 0 users
Votes 1
Subscriptions 185

Activity overview

Latest activity by Ashrakat Rady

  • Ashrakat Rady created an article,

    How to Create a New Wafeq Account?

    Wafeq helps you create a new account and set up your organization in a few simple steps. During the signup process, you’ll enter your basic information, create your organization, and answer a few ...

    • Ashrakat Rady
    • Updated
    • 0 followers
    • 0 comments
    • 0 votes
  • Ashrakat Rady created a post,

    Various methods to determine the useful life of an asset

    We need Various methods to determine the useful life of an asset

    • Ashrakat Rady
    • 1 follower
    • 0 comments
    • 0 votes
  • Ashrakat Rady created a post,

    طرق متنوعة لحساب العمر الإنتاجي للأصل

    نريد طريقة متنوعة نختار منها لحساب العمر الانتاجي للأصل

    • Ashrakat Rady
    • 1 follower
    • 0 comments
    • 0 votes
  • Ashrakat Rady created an article,

    How to Disassemble an Assembly Item and Return Its Components to Inventory (Disassembly Orders)

    You reviewed the production line after recording a completion of one hundred shirts, and it turned out that fifteen of them were never produced. They entered your inventory on paper, their componen...

    • Ashrakat Rady
    • Updated
    • 0 followers
    • 0 comments
    • 0 votes
  • Ashrakat Rady created an article,

    The Manufacturing Cycle in Wafeq: From Raw Materials to Finished Item

    You purchase a wooden board, screws, and legs, and a chair comes out of your factory. But between the two, there is a process that your accounting system needs to track in detail: which component w...

    • Ashrakat Rady
    • Updated
    • 0 followers
    • 0 comments
    • 0 votes
  • Ashrakat Rady created an article,

    Planning Purchases for Production Order Components (MRP)

    You planned to manufacture 100 shirts and saved the Production Order, and the system told you it is not ready for release: four of your six components do not have enough stock. So you need to know ...

    • Ashrakat Rady
    • Updated
    • 0 followers
    • 0 comments
    • 0 votes
  • Ashrakat Rady created an article,

    Analyzing Manufacturing Cost Variances

    You planned for the chair to cost you SAR 73, and it cost you SAR 79. Where did the six go?That is what variance analysis in Wafeq answers. After a Production Order is executed, the system compares...

    • Ashrakat Rady
    • Updated
    • 0 followers
    • 0 comments
    • 0 votes
  • Ashrakat Rady created an article,

    How to Create and Manage Production Orders

    After setting up the Bill of Materials (BOM) and defining the raw materials and their costs, the next step is the actual production process through a Production Order. This is the document that tur...

    • Ashrakat Rady
    • Updated
    • 0 followers
    • 0 comments
    • 0 votes
  • Ashrakat Rady created an article,

    Bill of Materials for Assemble Items (Manufactured Products)

    A Bill of Materials (BOM) is like a recipe that defines everything you need to manufacture a finished item. In Wafeq, the BOM does more than list the raw materials and quantities required. It also ...

    • Ashrakat Rady
    • Updated
    • 0 followers
    • 0 comments
    • 0 votes
  • Ashrakat Rady created an article,

    Bulk Reclassification of Transactions

    Wafeq allows you to reclassify multiple transactions from one account to another in a single operation, instead of opening documents and modifying each  transaction individually.This feature helps ...

    • Ashrakat Rady
    • Updated
    • 0 followers
    • 0 comments
    • 1 vote